When installing drywall, does the ceiling drywall go up first to the edge of the top plate 2x4 of the room, then the wall drywall will be pushed up against the ceiling's? Or do you put the wall drywall up first pushing against the ceiling joists, then the ceiling drywall pushing against the wall drywall?