I am looking at leasing a building that has two electrical services in it. One panel is a 200 amp and the other is a 100 amp, which are two feet apart, but separated by a stud wall with 3/8" plywood on one side, the other 1/2" Sheetrock. The other thing is the bathroom needs to be upgraded to an ADA compliant bathroom. The current bathroom is very small. There is just enough room for the sink and toilet. We are looking to knock out a wall in a hallway to enlarge the room to satisfy the ADA, but here is the problem;
1. After the wall is removed, the 200 amp service panel will be in the bathroom.
2. To move the service panel to the nearest suitable location, which is 12' away, will possibly remove the grandfathered dual electric services.
3. The owner of the building wants to be able to lease both halves of the building if we were to leave.
Will moving the service the 12 feet require the other service to be removed to bring it up to current code for virginia? It will cost me $1200 to move it.
The other option is moving the bathroom away from the service, which will cost me even more.
Will moving the panel cause me trouble as I noted above?
1. After the wall is removed, the 200 amp service panel will be in the bathroom.
2. To move the service panel to the nearest suitable location, which is 12' away, will possibly remove the grandfathered dual electric services.
3. The owner of the building wants to be able to lease both halves of the building if we were to leave.
Will moving the service the 12 feet require the other service to be removed to bring it up to current code for virginia? It will cost me $1200 to move it.
The other option is moving the bathroom away from the service, which will cost me even more.
Will moving the panel cause me trouble as I noted above?