I'm remodeling my kitchen. There is a small addition where the room was extended beyond the load bearing outer wall. They used a solid 4 x 10" 10ft beam. There was water damage to the beam and framing from a neglected roof leak.
I have rebuilt most of the framing and now have to work on the beam.
I would like to replace the beam with 3 2x10's laminated together.
How would I properly build the beam. Do I use DAP woodweld, or just stick with PL construction adhesive?
When I glue and clamp, what type of fasteners should I use?
Bolt them, screws, lag screws? Also what type of nailing pattern?
I have 1/4" 4" lag screws. Can I use these?
Much Appreciated
I have rebuilt most of the framing and now have to work on the beam.
I would like to replace the beam with 3 2x10's laminated together.
How would I properly build the beam. Do I use DAP woodweld, or just stick with PL construction adhesive?
When I glue and clamp, what type of fasteners should I use?
Bolt them, screws, lag screws? Also what type of nailing pattern?
I have 1/4" 4" lag screws. Can I use these?
Much Appreciated