I need to frame a soffit/chase/drop ceiling around heating ducts/electrical/plumbing. All this is located under and perpendicular to TJI 210 joists.
I considered attaching vertical 2 X 3 support members to the sides of the TJI joists by screwing the supports to the upper and lower joist flanges - these supports would support the new ceiling joists (rafters).
From looking at the manufacturer's spec info it indicates that 'squash blocks' are attached to the joists by screwing into the sides of the flanges - which is what I planned on doing.
I guess I'm searching for confirmation... anyone have knowledge/experience with this??? Thanx!
I considered attaching vertical 2 X 3 support members to the sides of the TJI joists by screwing the supports to the upper and lower joist flanges - these supports would support the new ceiling joists (rafters).
From looking at the manufacturer's spec info it indicates that 'squash blocks' are attached to the joists by screwing into the sides of the flanges - which is what I planned on doing.
I guess I'm searching for confirmation... anyone have knowledge/experience with this??? Thanx!