Hello,
I'm running cable horizontally along the perimeter of my bedroom, on both interior and exterior walls at about 2' from the floor. The walls are plaster over blue board. I'll also be replacing the flooring and trim.
When I get to the point of patching the wall, how much will I have wanted to take off to run the cable?
Will I have wanted to take off from 2' to the floor along the entire perimeter, where I'll then be plastering over new blue board to the concrete subfloor? Will I have just wanted to take off a continuous 1' channel, screwing the bottom of the wall to the studs as I went and patch that? Will I otherwise be happier if I just cut a 6'' hole next to every stud and patch them individually?
Thank you.
I'm running cable horizontally along the perimeter of my bedroom, on both interior and exterior walls at about 2' from the floor. The walls are plaster over blue board. I'll also be replacing the flooring and trim.
When I get to the point of patching the wall, how much will I have wanted to take off to run the cable?
Will I have wanted to take off from 2' to the floor along the entire perimeter, where I'll then be plastering over new blue board to the concrete subfloor? Will I have just wanted to take off a continuous 1' channel, screwing the bottom of the wall to the studs as I went and patch that? Will I otherwise be happier if I just cut a 6'' hole next to every stud and patch them individually?
Thank you.