I was wondering if someone could advise me on how to properly install r30 insulation (rolled or blown) on the ceiling of a new addition that is using trusses with 2x4's.
(location is northeastern Ohio if it matters)
I wanted to use blown insulation but wasn't sure how to do it with drywall having to wait until after the insulation inspection.
Thanks
(location is northeastern Ohio if it matters)
I wanted to use blown insulation but wasn't sure how to do it with drywall having to wait until after the insulation inspection.
Thanks