Prior to laying ceramic tile bathroom floor in 1983 house, replacing rusted enameled steel bathtub and rotted plywood subfloor consisting of two layers of 5/8" plywood (1 1/4" build).
Is it good or bad to extend new subfloor consisting of 1/2" cement board over 3/4" plywood (1 1/4" build) even under new bathtub or would 1/2" plywood over 3/4" plywood under the tub be preferable?
Thanks for your comments.
ucee59
Is it good or bad to extend new subfloor consisting of 1/2" cement board over 3/4" plywood (1 1/4" build) even under new bathtub or would 1/2" plywood over 3/4" plywood under the tub be preferable?
Thanks for your comments.
ucee59