I just had some stairs installed. The contractor said they would be carpet ready. On the first step and landind, he used osb. On the remaining 13 steps, he usef 2 2x4s that have a 4 inch gap. When i questioned him, he said carpet ready only means the landing. Doing the steps is finish work not included. Is this right? This isnt the first time we
disagreed. I had him add a new beam and remove a wall. He added the beam and removed the wall, but di,d not support the existing wall. The existing wall would move 6 inches in either way. I had to add the supports myself.