Hi,
I have underground PVC conduit running between a pool panel and a pavilion structure. The PVC conduit currently is not terminated in the panel. The other end needs to enter into a box mounted on the pavilion.
My understanding is that under the Canadian Electric code, I either have to
Are there any other ways to accomplish this and be code compliant?
I have underground PVC conduit running between a pool panel and a pavilion structure. The PVC conduit currently is not terminated in the panel. The other end needs to enter into a box mounted on the pavilion.
My understanding is that under the Canadian Electric code, I either have to
- terminate the conduit directly to the panel and the box and then I can run individual RW90 wires between them; or
- run NMWU cable through the conduit but exit the conduit before coming into the box or panel and enter both through a cable gland.
Are there any other ways to accomplish this and be code compliant?