When you install the flashing for the dormer you overlap the housewrap over the step flashing, correct? Do you tape the housewrap or leave open at bottom so as to not trap water if it gets behind? When I side the dormer the j channel is going to run along the flashing on the wall side so is it ok for the J channel to be nailed right over the step flashing?