I am replacing carpet in an upstairs hall with 3/4" prefinished wood flooring. At the top of the stairs, behind the top tread, there is not a suffient gap to install the flooring so that it will be flush with the top thread. Do I need to rip up the subfloor, remove and replace the top tread (and the wood under the baulester)? Any ideas?
Thanks,
Dave
Thanks,
Dave
Attachments
-
20.6 KB Views: 41,378