I'm finishing my basement (or, planning on it) and am trying to fix up somewhat of a schedule. I'm going to be putting in a couple of extra walls to accommodate a new bathroom and closet. At what point do I call the plumber? The plumbing has been "roughed in" (what looks like two drains coming up from the floor). I was assuming I would call after I had the 2x4 framing setup, but I'm not sure if I should get them there sooner.

Any help?
 

·
Registered
Joined
·
36 Posts
Discussion Starter · #3 ·
Thanks for the reply! I haven't even begun the finishing process in the basement (still just concrete slab and block walls atm). I'm guessing it will take me at least a couple months to get to the point that I'm ready for someone to come in and run the plumbing through the framing to where it needs to go. Do you think I should go ahead and call the people I plan on subbing out to (plumber, electrical, drywall ceilings)?
 
1 - 2 of 2 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top