Guys, please help me with this question if you could. I am installing a bar island in my basement. I would like to run power to the island. I cut a 2x2 inch Channel in the concrete today with my angle grinder to run a conduit chase. I will run the conduit tomorrow. My question is what should I fill this in with. I'm was just going to pour self leveling compound in the channel to fill up and over the pipe and void. Is this the best way of doing this? Any help would be greatly appreciated.
Mike
Mike
Attachments
-
83.8 KB Views: 146