I have a terribly out of level floor our washing machine sits on. It's an old concrete floor and its not consistently out of level. I was thinking of pouring a slab to put the machine on and level it out. I get the form, I get the mesh, I get the cuts, but I don't get how to make the form itself level?
I f I cut a perfect box out of 2x4, how do I a) get it tight to the crazy contours of the floor and b) get the top level?
Also, do I need to slope slightly it at all for water run off?
I f I cut a perfect box out of 2x4, how do I a) get it tight to the crazy contours of the floor and b) get the top level?
Also, do I need to slope slightly it at all for water run off?