I am having a new concrete slab poured on my driveway. Once finished I want to install a 5x5 vinyl fence post on top of the slab. It just so happens that part of the slab will be over a poured concrete retaining wall 2' high. So my fence post will be on top of a concrete slab which is on top of a wall. Any recommendations on what to do prior to or after they pour the slab to mount the fence post?
Thanks ahead of time
Thanks ahead of time