DIY Home Improvement Forum banner
1 - 5 of 5 Posts

· Registered
Joined
·
264 Posts
Discussion Starter · #1 ·
I need to raise one side of my bath 3/4'' to bring it to level..
before I lay the tile.
The house is a 1930's pier and beam with2x8 joist 24'' OC - 1x8 CM sheathing and 1 layer of 3/4'' fir subfloor

I have 3 bags of Type S masonry mortar left over I want use
$24 is $24 right ? type S is portland and sand with some lime thrown in?
Can I nail down my lathe and build the low side up with
the type S and feather in with a self leveling product?
 

· Registered
Joined
·
37,499 Posts
What's the clear span on the joist.
2 X 8's on 24" centers is not a great floor for any type of tile. Way under sized.
The right way to fix this would be by working under the floor to figure out the floor is sagging and fix that.
My guess would be because of the undersized and spaced to far apart joist.
 

· Registered
Joined
·
264 Posts
Discussion Starter · #3 ·
thanks for your concern but sagging isn't the problem or the question
the question is " is using type S masonry the same as mixing sand and portland
to make a mud bed on galvanized lathe "
I have always dreaded taking out those old style mud beds
and have always wanted to use one to level a floor
will the "extra strength TYPE S be a problem?
 

· Tileguy
Joined
·
6,054 Posts
  • Like
Reactions: kt82
1 - 5 of 5 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top