DIY Home Improvement Forum banner
1 - 4 of 4 Posts

· Registered
Joined
·
2 Posts
Discussion Starter · #1 · (Edited)
Hi

Hope someone can help.

I am about to fit a new toilet but need to check on the regulations. I have looked through the building regs part H but found no joy. Is it possible to turn right from the pan then go straight for about 3 feet through the external wall then right again for another 1 foot into the stack? I have been told informally that i can only have a bend every 6 feet. Is this correct?

Thanks

Neil
 

· BIGRED
Joined
·
487 Posts
Get a plumber pal. They put in closet bends directly below the toilet flange so the waste gets a fast vertical fall for momentum. That's one 90 degree turn. The best course for your waste to follow is a direct path to the 4" main stack. Don't try to build in an obstacle course for it or you will be on the end of a plunger for ever.
 

· Registered
Joined
·
2 Posts
Discussion Starter · #3 ·
Thanks for reply.

I will get plumber to fit the new suite but i need to plan the partition wall first. i hope to run the pipe right from the toilet and then one final 90 degree turn into stack. Do you know if this is possible?
 

· Registered
Joined
·
533 Posts
You need to use the proper radius and at least 3" pipe. I am not aware of an limit to the number of bends only the radius of the bends. I don't understand the part about a "pan" or the "external" wall. Usually a toilet is plumbed from under the floor and the waste would route in the bay of two joists to a stack. If you can provide a better description maybe I could be more help.

Rege

Rege
 
1 - 4 of 4 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top