Joined
·
48 Posts
So I need 3 footers under our existing concrete patio
Would you cut the slab right where the post are going to go and re pour that part
or should I move out a foot in the grass put the footer outside of patio and pour a strip to extend the slab.
Would you cut the slab right where the post are going to go and re pour that part
or should I move out a foot in the grass put the footer outside of patio and pour a strip to extend the slab.