My 20 year old house has a crawl space under the kitchen that can be accessed through a hole in the adjacent basement wall. When you enter the crawl space there is a 2 foot gap between the entrance and the dirt mound (the floor of the crawl space). You can see the other side of the basement wall footers and all. I have make repairs to the kitchen floor and need to place temporary supports within 2 feet of the crawl space entrance. It would be great to have a surface that is even with the dirt mound to support the jacks I need to use. Should I attempt to backfill and then compact some of this area to make it even with the rest of the crawl space floor or should I attempt to backfill the entire area? I estimate that it would take at least 30 cubic yards to back fill this area. I estimate it would take 2 or three yards to create a mound at the entrance. I am thinking of using stone dust as the fill material.Any on have any ideas on how to proceed?