Joined
·
46 Posts
These ideal in-sure push-in connectors have a continuity port for testing. Anyone able to tell me how to use this port?
The 'check port' touches the meter lead to the metal part which should be common with all the wires going into the connector. You would then touch the other meter lead to the far end of whatever wire is connected to test for continuity.i kinda messed that question up...
using a volt meter i expect one tip should be in the push in connector port but the other tip goes where? to the end of the wire? Does it test continuity for all the wires inserted into the connector?
Dave