If I have a drywall butt joint with one side clearly much lower than the other like in the photo, how do I begin?
Should I try to bring the low side level with some joint compound before taping so that the tape goes on flat?
Or tape right away? The tape will end up like a "stair," though with a big edge!
Should I try to bring the low side level with some joint compound before taping so that the tape goes on flat?
Or tape right away? The tape will end up like a "stair," though with a big edge!
Attachments
-
42.8 KB Views: 4,446