soaker tub and backsplash, kitchen backsplash, Var fixes around the house.
Joined
·
377 Posts
Hi,
My switches are actually located about a half an inch over the line from where the cabinet stops. I was thinking about moving it over to line up when I put in the tile? Please see attached pics. Also, I have some schluter edging (very thin face,) to use on the tile edges at this location, but someone suggested I take some unused tile and make a border. Any comments?
The tile is not in yet.
My switches are actually located about a half an inch over the line from where the cabinet stops. I was thinking about moving it over to line up when I put in the tile? Please see attached pics. Also, I have some schluter edging (very thin face,) to use on the tile edges at this location, but someone suggested I take some unused tile and make a border. Any comments?
The tile is not in yet.
Attachments
-
271.7 KB Views: 133
-
271.7 KB Views: 133
-
272.8 KB Views: 139