DIY Home Improvement Forum banner
1 - 1 of 1 Posts

·
flipping slumlord
Joined
·
5,116 Posts
Hello all, I've been learning a lot just reading through over the last month or so. I see that under NEC 2011 a neutral is required in switch boxes.
For NEW construction and larger remodeling projects.

Since I'm replacing some wiring in a basement bathroom
You probably don't need to do more.

The wiring comes from the panel to a can light which will be switched. From there a plan on 14/2 to the switch box...
...and you're done.

hth
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top