This is a very common question on this forum. You need to do a load analysis, which will account for the fact that only a fraction of the total potential power is likely to be required at any given time. The National Electrical Code contains a method for performing the analysis, I can't quote the section, but a competent electrician can perform the analysis, or you can try it yourself.