I am new to this forum and found alot of useful information by using the search on this website.
I bought a new single home house with an attached garage in Ontario Canada 2 years ago. I just installed a subpanel in my garage to run an air compressor and have more electrical outlets available. The subpanel is being supplied by a 60 amp, 220v breaker from the main (which is approx 10' away in the basement).
In the subpanel I have a 30 amp 220 and a 20 amp 110.
I am using 1/2" and 3/4"emt conduit (I bought pipe benders) because my garage is drywalled and insulated.
I bought individual stranded wires spool of #10 and #12:
-220v 30 amp #10 - Red (hot), Black (hot) and Green (ground)
-110v 20 amp #12 - Black (hot), White (neutral) and Green (ground)
I have all conduit pipe installed and I am about to pull the wires, here are my questions:
-Do I have to pull 2 ground wires, 1 for the 110 and the other the 220 or can I only pull 1 ground wire but use it for both breakers?
-Should I pull a neutral wire for the 220? Is there any 220 tools that require a neutral wires? (welder?)
-Since I am using stranded wires must I use crushable end terminal to connect to the outlets?
I have 4 outlets of 110 and 1 outlet of 220. I have ~40' of conduit on the wall and ceiling. I want everything to be to code.
Please let me know if more information is needed.
Thanks
I bought a new single home house with an attached garage in Ontario Canada 2 years ago. I just installed a subpanel in my garage to run an air compressor and have more electrical outlets available. The subpanel is being supplied by a 60 amp, 220v breaker from the main (which is approx 10' away in the basement).
In the subpanel I have a 30 amp 220 and a 20 amp 110.
I am using 1/2" and 3/4"emt conduit (I bought pipe benders) because my garage is drywalled and insulated.
I bought individual stranded wires spool of #10 and #12:
-220v 30 amp #10 - Red (hot), Black (hot) and Green (ground)
-110v 20 amp #12 - Black (hot), White (neutral) and Green (ground)
I have all conduit pipe installed and I am about to pull the wires, here are my questions:
-Do I have to pull 2 ground wires, 1 for the 110 and the other the 220 or can I only pull 1 ground wire but use it for both breakers?
-Should I pull a neutral wire for the 220? Is there any 220 tools that require a neutral wires? (welder?)
-Since I am using stranded wires must I use crushable end terminal to connect to the outlets?
I have 4 outlets of 110 and 1 outlet of 220. I have ~40' of conduit on the wall and ceiling. I want everything to be to code.
Please let me know if more information is needed.