Joined
·
64 Posts
I'm in the process of pulling up the old hardwood floor from two bedrooms. So far the subfloor, 3/4 diagonal boards, looks in good shape. Course the guy who put the old hardwood floor down only used one nail every 18 to 24 inches. At this point the only thing I am seeing is a few nails have risen about a finger nail thickness. Basically a few squeaks when I walk on it but not many. For the squeaks my plan is to add some screws to the tighten down the boards. Will I need to pre-drill or counter sink for the screws?