I'm in the process of building a wood working shop and would like to put spare conduits in the floor in case I want to move a table saw here or a planer there. I was counting on placing a 3/4" pvc conduit under grade and run a sweep up to floor level with a female adapter and a flush pipe plug at finished concrete grade.
This would give me access at a future date and not be a trip hazard if not in use. Are there any code considerations for this? Should I use a PVC sweep or a rigid sweep?
This would give me access at a future date and not be a trip hazard if not in use. Are there any code considerations for this? Should I use a PVC sweep or a rigid sweep?