If you are sandwiching beams to the post for a deck, where can you splice long beam runs and how? Beams are 2x10 and post are 4x4 and only about 12” above ground. I have about a 30’ run with 5 post using 16’ 2x10s. Will need to splice does it have to be on a post, please explain all my options and how – thank you all