The metal roof that I had installed last month was over very old shingles, cut a few curled edges, put down #30 paper (which was manufacture's spec) and then a 26g 5v metal, passed both inspections with permits showing there was no tear-off, saved time, money and land-fill space.
Attachments
-
30.9 KB Views: 9,004