Hello,
Doing a minor renovation on a bathroom in SC (vanity, paint, floor), and I find this when I pull the vanity out. The builder ran the cold water tap going over to the toilet in front of the vent riser preventing the drywall from sitting flush (they conveniently just knocked a hole in the drywall prior to installing the original vanity). The water line is CPVC coming up from the slab. To fix the drywall issue I want to cut the CPVC directly below the 1st tee, install a new coupling with a short piece of CPVC going to a new tee and run PEX out of the top of the tee over to the toilet using a CPVC to PEX adapter at both connections (There is more room toward the top of the riser allowing room for both PEX and drywall). Anyone see an issue with this plan? How would you do it?
Appreciate the help.
Doing a minor renovation on a bathroom in SC (vanity, paint, floor), and I find this when I pull the vanity out. The builder ran the cold water tap going over to the toilet in front of the vent riser preventing the drywall from sitting flush (they conveniently just knocked a hole in the drywall prior to installing the original vanity). The water line is CPVC coming up from the slab. To fix the drywall issue I want to cut the CPVC directly below the 1st tee, install a new coupling with a short piece of CPVC going to a new tee and run PEX out of the top of the tee over to the toilet using a CPVC to PEX adapter at both connections (There is more room toward the top of the riser allowing room for both PEX and drywall). Anyone see an issue with this plan? How would you do it?
Appreciate the help.
Attachments
-
119.4 KB Views: 179
-
97 KB Views: 192