i am building an addition with a full bathroom. i am bringing the hot and cold supply lines to it with 3/4" lines. i plan to transition down to 1/2" lines right at each individual fixture. is this ok or should i step down to 1/2" as i come off the main lines and run the individual supplies in 1/2"?