I am going to run NM sheathe 12/2 w/ ground from panel box ( out side mounted ) into my attic. The first 5 feet of the NM cable will be in schedule 80 pvc from box into attic. What ID of schedule 80 PVC do I need for the proper fill rate?
This is the proper way to run your circuit.You will need to run #12 THWN or THHN/THWN wire... a white, black and green will do. Any 1/2" conduit is fine. You can junction that in the attic and run NM from there on if you like... just provide a j-box with proper fittings and cover lid.
There is more than 1 proper. UF sleeved in conduit is perfectly compliant and easier for the poster. Many poster state their opinion as code.This is the proper way to run your circuit.