At EXTERIOR walls, is truss uplift a concern, like it is at interior, non-load bearing walls?
Ignorant as a puppy, I never worried about it on my house 32 yrs ago, (which has an interior load bearing wall), but now that I am aware of truss uplift I have a question about it on exterior walls.
I have a shop that is 20' wide, clear span, and the trusses span the 20' width. My plan was to stop screwing the lid sheet rock to the trusses about 16" from the exterior wall and then put a few screws through the lid sheet rock into a 2x8 block that is nailed to the top plate of the wall.
Make sense? A 2x8x22" block, laid horizontally and nailed to the top plate of the wall, sticking into the room 2", for a screwing surface. This should allow the truss to lift a little bit and not affect the sheet rock.... I think. I'd also stop screwing the wall sheet rock to the walls about 8" below the ceiling. Is truss uplift at the exterior a huge deal?
Is the 2x8 necessary or even helpful for holding the lid sheet rock in place? Thoughts? I should add that this is climate zone 8, so there will be significant temperature differential between the top and bottom chords of the trusses, thus a potentially large truss uplift.Thanks.
Ignorant as a puppy, I never worried about it on my house 32 yrs ago, (which has an interior load bearing wall), but now that I am aware of truss uplift I have a question about it on exterior walls.
I have a shop that is 20' wide, clear span, and the trusses span the 20' width. My plan was to stop screwing the lid sheet rock to the trusses about 16" from the exterior wall and then put a few screws through the lid sheet rock into a 2x8 block that is nailed to the top plate of the wall.
Make sense? A 2x8x22" block, laid horizontally and nailed to the top plate of the wall, sticking into the room 2", for a screwing surface. This should allow the truss to lift a little bit and not affect the sheet rock.... I think. I'd also stop screwing the wall sheet rock to the walls about 8" below the ceiling. Is truss uplift at the exterior a huge deal?
Is the 2x8 necessary or even helpful for holding the lid sheet rock in place? Thoughts? I should add that this is climate zone 8, so there will be significant temperature differential between the top and bottom chords of the trusses, thus a potentially large truss uplift.Thanks.