I'm setting a 12" by 42" deck footer. Probably is I dug down 2 ft and ran into what appears to be a sump pump leach bed. I dug the hole out then gravel from the sides falls in. I dug down 40". The other 5 holes I dug with no problem. Any idea how I can get the tube down withouy gravel falling in? Thanks