As far as setting the post goes, dig your hole about 26" deep. I like to balloon the bottom of the hole depending on what type of soil I am setting in. Backfill and set the post in the hole and add concrete (40-60 lbs is usually good).Ok...what is the trick to setting a rock solid 4x4 PT 8ft'er?
I am putting in 16 foot post 36 to 42 inches deep. I ran in to high water table so I have standing water in each hole. I was going to put gravel in bottom of hole, put post in, then pour in dry cement and let the water from the earth set the concrete. What do I do with the standing water?
tom