I got SER cable when I really need SEU cable.
This was covered in an earlier post.
Can I just cut the bare aluminum conductor off in the SER cable where it comes out of the jacket and use the three insulated conductors (which are striped and labled) between the meter and the panelboard?
Thanks in advance
This was covered in an earlier post.
Can I just cut the bare aluminum conductor off in the SER cable where it comes out of the jacket and use the three insulated conductors (which are striped and labled) between the meter and the panelboard?
Thanks in advance