DIY Home Improvement Forum banner
1 - 5 of 5 Posts

·
Registered
Joined
·
16 Posts
Discussion Starter · #1 ·
I had to cut a hole in my concrete floor to move a drain for a shower, I'm wondering if anyone can tell me how long I have to wait for the new concrete to cure before I can put self leveling cement over it (I'm putting in in-floor heat so I have to use the self leveler)
 
1 - 5 of 5 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top