DIY Home Improvement Forum banner
1 - 11 of 11 Posts

·
Registered
Joined
·
16 Posts
Discussion Starter · #1 ·
I had to cut a hole in my concrete floor to move a drain for a shower, I'm wondering if anyone can tell me how long I have to wait for the new concrete to cure before I can put self leveling cement over it (I'm putting in in-floor heat so I have to use the self leveler)
 

·
Retired Moderator
Joined
·
25,770 Posts
Sorry I am not familiar with that one. Is that what the heat system recommends?

I wish I could be of more help.---Mike--
 

·
Retired Moderator
Joined
·
25,770 Posts
You said you were putting in in floor heat---I figured it was an electric under floor system-----
Perhaps I an a bit confused.
 

·
Retired Moderator
Joined
·
25,770 Posts
If you are looking to fill in some low or uneven spots before you bed your electric mat into Firmset--
consider using 'Feather finish' or even vinyl cement patch.
If you need to level the floor check out 'Jiff Set'

All of the above work over new cement----There is a technical help phone number on the bag of stuff that you bought--Call it and ask if it's the right thing for your use.---Mike--
 
1 - 11 of 11 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top