I am installing a railing that has an S-turn where it transitions from open risers to closed risers at the cieling. I know that usually the balusters leave the railing at the s-turn and then run from the tread to the cieling. Has anyone ever seen a stair where the balusters follow the s-trun and attatch to the railing all the way up to the top of the stairs?
Attachments
-
89.7 KB Views: 279