Joined
·
9 Posts
So bought some new direct bury wire 2224. Need to know what i need between the main box and the trench, and between the trench and sub panel.
Already have the subpanel wired up. The main panel is 200a w/ a 100 amp breaker installed for the garage line.
Does the wire from the main paned need to be in conduit from the main panel untill it goes under the dirt, or where?
When the wire comes up, where does the conduit need to start? Just below the dirt or where?
Thanks!
Already have the subpanel wired up. The main panel is 200a w/ a 100 amp breaker installed for the garage line.
Does the wire from the main paned need to be in conduit from the main panel untill it goes under the dirt, or where?
When the wire comes up, where does the conduit need to start? Just below the dirt or where?
Thanks!