HI All,

I am installing a set of interior french doors.

I am enquiring on what is reasonable for level prior to installing the jambs and doors.

The height between the header and floor drop 9/16" from one side to the other.
In further investigation about 5/16" is the result of the floor sloping.
The balance 4/16" is the result of a crown in the header.

The opening was an exisiting opening without any doors, so i simply framed the rough opening by using the existing header and bring in the walls to the specified width.

My question lies with the slope in the floor.

How do i compensate for the slope in the floor with my Jambs.

Lastly the floor covering will be 3/4" hardwood.

Paul
 

·
journeyman carpenter
Joined
·
3,480 Posts
determine the height of the door header and make it dead level.. the jamb legs have to be cut differnt lengths to accomodate the out of level floor
 

·
Registered
Joined
·
39 Posts
Discussion Starter #3
Kirk,
Thanks for your very fast response.

Would there be any reason to shim the low side to level or stick with trimming the high side.

Paul
 

·
journeyman carpenter
Joined
·
3,480 Posts
it depends on the situation.. if you have a finished floor down you have to cut the jamb legs exact, if the floor isnt down yet you can just lift the low leg til you get the header level, reason being the jamb leg and casing gets undercut so the flooring slides underneath leaving no gap between the floor and jamb assembly
 

·
Registered
Joined
·
37,261 Posts
If I understand you fully, trying to install any double door is hard enough when everything is square and level.
Trying to do it over a sloped floor would be a nightmare.
Shimming under the threshold would leave voids.
What I've done many times in older homes is make some tapered shims to form sort of a dam and filled with self levelling non gypsom floor leveler.
Now you have a perfectly flat surface to set the door on and the threshold makes 100% contact.
If you do not take the time to properly flash under that door before it goes in it will fail 100% of the time.
 

·
journeyman carpenter
Joined
·
3,480 Posts
joe.. your point is very valid, however this is for an interior door,, if you need flashing under this particular door chances are someone has a bad habit of leaving the kitchen sink running with the plug in.
 

·
Registered
Joined
·
37,261 Posts
Oh poop, totaly missed that one good catch. My bad. Why not take the time to figure out why it's not level and fix that under the floor?
 

·
Registered
Joined
·
39 Posts
Discussion Starter #8
Hi Joe,

I had to think long and hard on wether to fix the slope in the floor.

I have a crawl space so there was an opportunity for me to jack of the joist or at least investigate further on the root issue.

In the end my relative lack of experience in the matter ruled.

I did shim the lowside per Kirk's comments. The door was installed over the weekend and i only missed the first half hour of the football game. The door sits plumb with proper margins between door and head jambs.

I will likely try and shim the floor when i install the finished flooring as my next step to ensure the margin between the floor and the door is somewhat uniform.

In reviewing my relatively well built home i note the floors slope across most interior doorways. Not sure why this occured other than poor framing. I havent noticed any settling in the drywall etc.

Although out of the scope of this thread i will try and investigate further how to rectify the sloping floors for my own general interest.

Paul
 

·
Registered
Joined
·
39 Posts
Discussion Starter #10
Hi Kirk,

Agreed with your comments on throwing the doors out of plumb if the floors are adjusted with jacks etc.

I will likely try and pad out the floor with tar paper to try and bring the floor to level with the door.

Jacking up the floor is beyond my expertise at this point, but i will follow up with a fact finding tour of my crawlspace and attic to see if i can narrow the source of the slope. But this is more for building my skill set for future remodels.

Paul
 

·
journeyman carpenter
Joined
·
3,480 Posts
jacking up the floor wont throw the door out of plumb it will throw the header out of level. as the door jamb is attached to the jack studs.. by jacking up the floor it will push the bottom plate and the framing up with it.. unless you plan on take the door frame out before you do this

when older homes get lifted in order to create a full basement door frames get thrown totally out of wack as the structure will shift
 

·
Roofmaster
Joined
·
3,731 Posts
20 points deducted from Joe for saying "My Bad" The next person that says that around me is getting the Louisville slugger.

The door has to be installed plumb square and level, irrespective of the opening. Got it?
 

·
Registered
Joined
·
52 Posts
20 points deducted from Joe for saying "My Bad" The next person that says that around me is getting the Louisville slugger.

The door has to be installed plumb square and level, irrespective of the opening. Got it?
Gonna be hard to get it square since the jambs would be cut, now wouldn't it???
 

·
Roofmaster
Joined
·
3,731 Posts
The length of the jambs has nothing to do with whether the door is square (to itself). On prehung doors, (Is this prehung?) the jambs are made longer to allow for rug etc. You want it level and plumb so the doors don't swing by themselves.

A door can be hung square, level and on plane in spite of its surroundings with shims.

Is your structure sound? 9/16" is a lot in 5 or 6 feet.
 

·
journeyman carpenter
Joined
·
3,480 Posts
The length of the jambs has nothing to do with whether the door is square (to itself). On prehung doors, (Is this prehung?) the jambs are made longer to allow for rug etc. You want it level and plumb so the doors don't swing by themselves.

A door can be hung square, level and on plane in spite of its surroundings with shims.

Is your structure sound? 9/16" is a lot in 5 or 6 feet.

if theres a finished floor being worked off of the length of the legs has everything to do with the frame being square .. the o.p stated that teh floor isnt level.. and the finish floor is down.. the legs have to be hard down on the floor which means cutting the legs to teh exact length so that the header stays level also
 

·
Pro
Joined
·
123 Posts
Is your structure sound? 9/16" is a lot in 5 or 6 feet.
We've been doing a remodel in a 40-year-old home with a variety of floor framing techniques, not done to account for wood shrinkage. The joists are 2x12s, and there are level differences of up to 1 1/4" throughout the home, often in just a couple feet. Totally sound, just everything is up- and down-hill.
 

·
Registered
Joined
·
39 Posts
Discussion Starter #18
Hi All,

Sorry for the late reply, i never got a notification of additional comments on this thread.

RE: Is the structure sound
From my research the foundation, joints etc are all stable and the structure itself is sound.

I am thinking the slope is more of a measurement issue from the installer as there is no evidence from the crawl space that the joists are undersized or sagging.

Re: Update
I did get the doors installed with the jambs and headers plumb.
Everything works as planned, now i have to work on padding out the flooring slightly to avoid the glaring gap between the door and the (future installed)floor.

Paul
 

·
Roofmaster
Joined
·
3,731 Posts
You got the jambs plumb, you got the header level.
 