I had a new central system installed recently. The original air handler had a 6-2 romex coming through the ceiling of the closet and entered into the side of the unit. (the 6-2 is used because there's a 10kw electric strip in there)
The AC contractor used the same romex and terminated it the same way. But he made some comment that it might not pass inspection and might have to be in greenfield. I have them coming out next monday to look at the job their installer did. Do you think the romex is ok? There's no way to go back to the circuit breaker panel without ripping a lot of drywall as the closet is upstairs and the cb panel is downstairs. I guess a junction box could be put in the upper attic and from there go down into the closet with greenfield and thhn wire.
thanks!
The AC contractor used the same romex and terminated it the same way. But he made some comment that it might not pass inspection and might have to be in greenfield. I have them coming out next monday to look at the job their installer did. Do you think the romex is ok? There's no way to go back to the circuit breaker panel without ripping a lot of drywall as the closet is upstairs and the cb panel is downstairs. I guess a junction box could be put in the upper attic and from there go down into the closet with greenfield and thhn wire.
thanks!