Joined
·
64 Posts
I have a brick chimney that is in pretty bad shape with lots of mortar cracks and leaks. It is about 6 feet high. There is no framing on the inside, just a brick/mortar chimney with the metal pipe inside. I'd like to tear the whole thing down and replace it with a stud framed chimney covered with Hardie plank siding and a metal vent cap. Does anyone have any kinds of plans for constructing this? Here are my main concerns:
- How do I fasten the chimney framing to the rafters? And can i just attach it to the 2 X 6 roofing rafters or do I need to go down to the 2x6 horizontal rafters on the attic floor?
- What kind of spacing do I need to maintain between the wood framing and the metal vent pipe?
- 2X6 or 2X4 studs for the framing?
- how is the vent cap attached to the top? the vent cap cant contact wood or other combustible material, right?