I am thinking remodelling the second floor starting this spring.
Need to replace old 6mm laminate floor, trims and baseboards...... the list goes on.
Before I put down new floor I have to make the subfloor as level as possible.
There is one sagging joist on the first floor under my fridge.
If I leave it alone (will fix that when we save enough to remodel the whole kitchen) for now, will repair the sag in the future affect second floor's level?
I don't want to work in the wrong order, that means extra work in the future on second level:vs_no_no_no:
advice appreciated
Need to replace old 6mm laminate floor, trims and baseboards...... the list goes on.
Before I put down new floor I have to make the subfloor as level as possible.
There is one sagging joist on the first floor under my fridge.
If I leave it alone (will fix that when we save enough to remodel the whole kitchen) for now, will repair the sag in the future affect second floor's level?
I don't want to work in the wrong order, that means extra work in the future on second level:vs_no_no_no:
advice appreciated