Hi. Two questions about re-roofing my home, (30 squares, 4/12 pitch, class 4 asphalt shingles):
Should I use a nail gun or do it by hand? I have seen contractors using both methods. What are the pro's and cons?
The roof has an original 1/2 inch cdx deck. New code is minimum 5/8. Most roofs in this area are now done with 3/4. Assuming the original is in good shape, can I add another 1/2" layer to the existing plywood to bulk it up, or should I tear it off and redo it with 3/4 or just leave well enough alone? the local inspector says he can't make me re-deck and is not inclined to say one way or the other what I should do.
Lastly, ice dam. Is it necessary? Our local area, southeast Wyoming, does not require it. I want to do this right and I see a lot of posts on this site recommending it.
Thanks for your help!
Should I use a nail gun or do it by hand? I have seen contractors using both methods. What are the pro's and cons?
The roof has an original 1/2 inch cdx deck. New code is minimum 5/8. Most roofs in this area are now done with 3/4. Assuming the original is in good shape, can I add another 1/2" layer to the existing plywood to bulk it up, or should I tear it off and redo it with 3/4 or just leave well enough alone? the local inspector says he can't make me re-deck and is not inclined to say one way or the other what I should do.
Lastly, ice dam. Is it necessary? Our local area, southeast Wyoming, does not require it. I want to do this right and I see a lot of posts on this site recommending it.
Thanks for your help!