Hi there,
I have a burnt bus bar in my 100 amp "meter/load center" out door box (don't use SquareD breakers for replacement in a Siemens box, even though they fit)
I had an electrician give me an estimate that I can't afford to replace the entire box, and there's really no need to.
I have purchased an identical box and want to just swap out the bus bar, and all the breakers (6) including the main (included with the new box)
My plan is to shut off all the main and then pull the meter (smart), swap out the bus bar, and breakers, put the meter back in and turn on the main breaker.
Am I missing anything?
Will SDG&E spank me for pulling the meter, and if so how hard?
TIA
I have a burnt bus bar in my 100 amp "meter/load center" out door box (don't use SquareD breakers for replacement in a Siemens box, even though they fit)
I had an electrician give me an estimate that I can't afford to replace the entire box, and there's really no need to.
I have purchased an identical box and want to just swap out the bus bar, and all the breakers (6) including the main (included with the new box)
My plan is to shut off all the main and then pull the meter (smart), swap out the bus bar, and breakers, put the meter back in and turn on the main breaker.
Am I missing anything?
Will SDG&E spank me for pulling the meter, and if so how hard?
TIA