DIY Home Improvement Forum banner
1 - 4 of 4 Posts

· Registered
Joined
·
37,499 Posts
Sheetrock is always done first!!
A whole lot easier to hang, finish prime and paint two coats on the drywall before the doors are installed so most can be done with a roller and cut out 50% of the cutting in.
 

· Registered
Joined
·
5,697 Posts
Split Jambs (casing pre-attached) are always after. Solid jambs might be done either way.
 
1 - 4 of 4 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top