I have a question about pouring a concrete pad? I basically want to pour about an 8'x8' pad for a hot tub which will ultimately be under a deck. Is there anything extra that needs to be done to house a hot tub, any extra bracing. What is the procedure on prepping the surface to be poured onto. I can make the frame and such but how much earth do I need to remove before I put down the compacted surface and what surface do I put down to compact? Sand/Pea rock? I really don't know exactly how to do it but I hope with your help I can get it done.