An acquaintance of ours had this metal building constructed as a garage /shop. I'm not sure how wide spread this contractor works but there is a possibility i could get that information.
The building was erected then the concrete floor was poured. Consider allowing me to give some free advise on concrete floors. Sleeve all pex water supply lines to each fixture in plastic sleeves under the concrete. Install all supply HVAC duct work under the slab prior to pouring. Place all return HVAC ducts above in the conditioned area for a down flow furnace.
EDIT EDIT: