I am installing a new shower system (3/4") - the main is 3/4" but splits immediately into 1/2" cold and 1/2" to the hot water heater. I'm thinking I need to re-plumb all the way back to the 3/4" copper main.
The question is should I go with 1" pex, or 3/4" pex. I know it's counter intuitive to go from 3/4" copper main to 1" pex, but I thought I read somewhere that pex actually has a smaller inside diameter and a lower flow rate. I'm thinking by going 1" pex down the center of the house (where everything feeds from), I won't have water pressure issues later on. I'll tee off all the old feeds into the 1/2" existing copper.
The shower will have a rain shower, two hand helds and 4 body wash jets - so will pull quite a bit of water) although likely they will not all be on at the same time).
Any thoughts?
The question is should I go with 1" pex, or 3/4" pex. I know it's counter intuitive to go from 3/4" copper main to 1" pex, but I thought I read somewhere that pex actually has a smaller inside diameter and a lower flow rate. I'm thinking by going 1" pex down the center of the house (where everything feeds from), I won't have water pressure issues later on. I'll tee off all the old feeds into the 1/2" existing copper.
The shower will have a rain shower, two hand helds and 4 body wash jets - so will pull quite a bit of water) although likely they will not all be on at the same time).
Any thoughts?